Building permits in Madrid: what you need and how long they take

Responsible declaration, major or minor works permit: which one fits your renovation, what documents are required and realistic timelines.

Building permits in Madrid: what you need and how long they take
← Back to the blog
26 September 20261 min readBy Fanworking team

Types of procedure

Usual documents

  1. Signed project or technical report
  2. Detailed budget
  3. Proof of fees and ICIO tax

Timelines

A responsible declaration lets you start almost immediately; a major works permit can take 3 to 6 months. We handle it from start to finish.

#permits#renovation
Share:WhatsApp ↗LinkedIn ↗Email ↗

Latest posts

26 September 2026 · 1 min read

Building permits in Madrid: what you need and how long they take

Responsible declaration, major or minor works permit: which one fits your renovation, what documents are required and realistic timelines.

Read →
19 September 2026 · 1 min read

Changing a commercial unit into a home: step-by-step guide

Planning rules, ceiling height, light and ventilation: how to know whether your unit can become a home and what steps to follow.

Read →
8 September 2026 · 1 min read

How much does renovating to rent pay off? An example with numbers

Buying, renovating and letting a 70 m² flat in Madrid: total investment, expected rent and net yield.

Read →

See all posts →